CSA A277 & NBC 2026 CERTIFIED · ARCTIC R-40+ ENVELOPE
+1 (437) 999-5406
NexMod Aerospace Insignia
NEXMOD
Aerospace Building Science
Next-Generation Volumetric Building Science

Smart spaces for people to
work, learn and live.

Faster. Smarter. Modular.

Transforming off-site modular construction across Canada. Factory-assembled cold-formed structural steel chassis delivering 48-hour rapid lockup with continuous R-40 Arctic envelope performance for sub-zero climates down to -50°C.

NexMod Technologies Luxury Volumetric Modular Architecture
Flagship Demonstration Suite

NexMod Model R-3 Executive

Architectural Steel & Natural Birch Cladding · Certified for -50°C Canadian North

Indoor Factory Fabrication
48h On-Site Assembly
-50°C Sub-Zero Arctic Rating
R-40+ Continuous Insulation
STC 55 Acoustic Sound Isolation
50-Yr CMHC MLI Select
The NexMod Multi-Sector Matrix

The 3 Modular Applications

Engineered from a unified precision cold-formed steel chassis, configured into three purpose-built functional architectures.

PILLAR 01 550 – 1,150+ SQ FT

Live

Residential & Community Housing

Rapid-deployment housing for northern families, elders, and workforce communities. Engineered with Arctic mudrooms, indestructible commercial finishes, radiant in-floor heating, and R-40 continuous wall insulation.

  • Model R-1: 550 sq. ft. Elder / Independent Suite
  • Model R-2: 850 sq. ft. Northern Family Home (2 Bed)
  • Model R-3: 1,150 sq. ft. Executive Home (3 Bed / 2 Bath)
  • Model R-M: Multi-Family Stacked Community Infill
Assembly: 24 – 48 Hours Inquire Housing →
PILLAR 02 1,200 – 4,800+ SQ FT

Work

Offices, Band Halls & Operations

High-performance administrative headquarters, municipal complexes, and remote industrial field command. Turnkey delivery with council chambers, private offices, secure server vaults, and commercial access control.

  • Model C-1: Band Administration & Council Chambers
  • Model C-2: Municipal & Corporate Office Suites
  • Model C-3: Industrial Mining & Forestry Field Command
  • Pre-Wired: Cat6A, access control & server integration
Assembly: 48 – 72 Hours Inquire Offices →
PILLAR 03 1,200 – 2,400+ SQ FT

Learn & Heal

Daycares & Healthcare Clinics

Turnkey facilities engineered to provincial healthcare and early learning licensing standards. Features medical-grade seamless antimicrobial surfaces, lead-lined X-ray shielding, HEPA filtration, and cultural healing spaces.

  • Model H-1: Community Medical Clinic & Nurse Station
  • Model H-2: Mobile Dental Operatories & Sterilization
  • Model H-3: Indigenous Wellness & Ceremonial Healing Lodge
  • Model C-2: Licensed Early Learning Community Daycare
Assembly: 48 – 72 Hours Inquire Clinics →
The Industrial Advantage

Why Conventional Construction Fails the North

Short sub-zero building windows, remote freight penalties, and chronic skilled trades shortages make traditional site-built construction unpredictable and cost-prohibitive. NexMod solves this with 90% indoor robotic fabrication.

70% Faster Delivery

Civil works and foundation prep happen concurrently with factory fabrication. What once required 18 months on a remote site is delivered and enclosed in under 48 hours.

True -50°C Thermal Envelope

Continuous R-40+ continuous insulation with zero thermal bridging. Engineered specifically for Northern Saskatchewan, Nunavut, and Northern Ontario where energy costs are critical.

Fixed-Cost Guarantee

Eliminate remote weather delays, unpredictable contractor change-orders, and cost overruns. Factory pre-fabrication locks in guaranteed fixed contract pricing from day one.

Primary Industrial Plant

Manufacturing & Assembly Hub
Marysville, Ontario

All NexMod structural volumetric modules and Arctic envelope assemblies are fabricated within our dedicated industrial manufacturing facility located at 7455 Old Highway 2, Marysville (Shannonville), ON. Shifting 90% of assembly indoors eliminates weather delays and guarantees millimeter-level precision.

  • Facility Address: 7455 Old Highway 2, Marysville, ON K0K 2N0
  • Logistics Corridor: Direct access to Highway 401 & trans-continental rail routes
  • Quality Standards: Precision CSA A277 & NBC 2026 factory inspection protocols
Eastern Plant (Active): 7455 Old Highway 2, Marysville, ON
Western Plant (Buildout Underway): Gateway Mall Logistics & Assembly, Prince Albert, SK
Production Scaling: Saskatchewan Assembly Scaling · Phase 1 Prototype In Queue
Western Demonstration Pavilion: Gateway Mall Concourse Unit 155
Operations & Dispatch: +1 (437) 999-5406
Western Canada Demonstration Center

Experience Build Quality in Person at Gateway Mall

Prince Albert is the central commercial gateway for all of Northern Saskatchewan. To allow Chief & Council leadership, housing managers, and municipal directors to evaluate our build quality firsthand, NexMod maintains a Permanent Full-Scale Walk-In Display Suite directly on the Gateway Mall concourse pavilion.

  • Walk-In Pavilion: Gateway Mall, 1403 Central Avenue, Prince Albert, SK
  • VIP Tours: Scheduled walkthroughs coordinated with Director Greg Dionne
  • Materials Inspection: Review construction cutaways, finish options, and delivery schedules
Schedule Showroom Walkthrough
Showroom Status: Permanent Walk-In Display Suite
Demonstration Unit: Model R-2 (2 Bed / 1 Bath Showcase)
Thermal Rating Display: R-40 Continuous Cutaway Wall Display
Location: Gateway Mall East Concourse / Unit 155
On-Site Direct Line: +1 (306) 980-9244
Government & First Nations Funding

Pre-Engineered for Federal Grants

All NexMod building packages are engineered to meet or exceed mandatory federal and provincial capital funding benchmarks, enabling rapid procurement without bureaucratic delays.

ISC GRANTS

Indigenous Services Canada

Direct eligibility under the First Nations On-Reserve Housing Program and Emergency Community Infrastructure Capital. Full CSA A277 certification ensures instant sign-off.

CMHC FUNDING

Rapid Housing Initiative (RHI)

Turnkey compliance with CMHC Rapid Housing Initiative requirements, delivering permanent, energy-efficient housing units in less than 12 months from allocation.

50-YR FINANCING

CMHC MLI Select

Exceeds 40% energy reduction thresholds and 20% accessibility targets, qualifying multi-family modular developments for up to 50-year amortizations and 95% LTV.

Verified Compliance & Engineering Stamps

Certified Building Science & Material Standards

NexMod structural envelopes leverage Canada’s most rigorously tested structural insulated steel systems, engineered in partnership with top Canadian building manufacturers.

CCMC 13627-R Natl Research Council
CAN/ULC-S102 Class A Fire Tested
R-40+ ARCTIC NECB / ASHRAE 90.1
CSA A277 Factory Certified
CSA S136 Cold-Formed Steel
ISO 9001:2015 Precision Quality
Artspan 24G Structural Insulated Panel Technology 24-Gauge Pre-Painted Steel Exterior · High-Density Rigid Polyurethane Core · Integrated Wiring/PEX Utility Chase
National Building Code Part 3 & Part 9 Approved
Connect with Leadership

Initiate Your Modular Project

Whether you are planning a 10-home elder community, a 50-unit workforce complex, a band administration headquarters, or a remote medical clinic, our engineering team is ready to configure your specifications and schedule factory delivery.

Manufacturing & Production Facility 7455 Old Highway 2, Marysville (Shannonville), ON K0K 2N0
Western Demonstration Pavilion & Showroom Gateway Mall, 1403 Central Avenue, Prince Albert, SK S6V 7J4
Corporate Head Office Alrifai Holding · 8-1521 Trinity Drive, Mississauga, ON L5T 1P6
Executive Line +1 (437) 999-5406
Official Web Domains nexmod.ca · nexmodtech.com